
Personnel Details
Full Name : James Nash
Age Next B/Day : 33
Marital Status : Married
Height : 6ft
Health : Excellent, No Disabilities
Email : [email protected]
Education & Formal
Qualifications
HNC Mechanical Engineering Design _ Distinction
ONC Mechanical Engineering _ Distinction
City & Guilds of London Institute_ Distinction
Company
Training
1983-1987 Four year
craft apprenticeship, Including machining discipline and vehicle fitting.
1989
Vehicle Dynamics & Refinement
1990
TQI
1992
TQM
and BS5750 / ISO 9000 awareness
1992
Supervisory Techniques & Man Management
1994-1998 ISO 9000 Auditing.and additional
management courses
Employment:
1999 onwards
Current Position : Manager Facilities and Structural Projects.
Responsible For : The management of a team of professionals catering for the needs
of a complete Electro-hydraulic test facility. Project managing the introduction of new
test facilities and construction of in-house test rig requirements. Supporting the needs
of a busy motor vehicle development centre. Also responsible for total departmental budget
control.
1996 1999
Position : Manager C.R.E.S.T. (Combined Road & Environment
Simulation Test).
Responsible For : The reliable and efficient running of
multimillion pound test facility comprising technical problem resolution, dynamic
monitoring of vehicles, in addition to the management control of a 6 man team providing
24hr operation.
1994-1996
Position : Project Engineer, Vehicle Simulation Test.
Responsible For : Project management of the design, development and
construction of new climatic, and dynamic 4 poster hydraulic simulation facility (MTS
RPC3), controlling sourcing of equipment and project budget of over £2 million.
1992-1994
Position : Facility Engineer.
Responsible For : Calibration and maintenance of complete vehicle fuel system
test laboratory.
1991-1992
Position : Design Engineer.
Responsible For : Individual engine component design, working on multi-piece
cintered camshafts and complex aluminium castings.
1989-1991
Position : Team Leader
Responsible For : Control and running of 3 Mechanical development,
10 Performance development & 2 Combustion research engine test beds. Having
technical guidance and man management responsibility for 30 personnel.
1987-1989
Position : Facility Engineer
Responsible For : Providing technical guidance and support to engine test bed
personnel with reference to equipment operation.To update and maintain engine test bed
equipment, and monitor overall test facility utilisation.
1983-1987
Position : Fitter (Engine Test)
Responsible For : Operating fully computerised test bed facility, general
fabrication, operation of lathes, millers, grinders, engine strip and rebuild and Electro-hydraulic
facility support.
Interests
and Hobbies
Cycling
Motorcycling
Drag Racing. _ Spectator
& My Kids
